Vibrating concrete to eliminate air pockets and voids |

Recently poured foundation wall, note straw for freeze protection |

Recently poured footing for the commons area |

Preparing foundation forms. Blankets prevent ground freezing
before pouring |

Recently poured foundation wall, with insulation and drain
line |

Backfilling a completed foundation wall |

Excavating for next footing to be formed and poured |

The building boundaries are slowly appearing |

Compacting foundation wall backfill |

Recently pouring foundation footing in commons area |

Footing excavations, ready for formwork |

Double-checking footing elevations |

First delivery of structural steel |

Unloading structural steel and positioning for installation |
|